1. HOME
  2.  / road kerb method statement

road kerb method statement

About

17-road kerb METHOD OF STATEMENT FOR ROAD KERB

METHOD OF STATEMENT FOR ROAD KERB 1. Before a complete site mobilisation of kerbing works take place, the pegging of finished kerb levels are carried out by the main contractor and sub-contratcor to levels furnished by surveyors. 2. The cement : quarry dust : aggregate ratios of a pre-determined compressive strength prior to the construction of extruded cast in-situ concrete is formulated.

Get Price

METHOD STATEMENT SUPPLY AND LAY IN SITU

METHOD STATEMENT SUPPLY AND LAY IN SITU CONCRETE ROAD KERB • Upon approval of marked areas, the alignment and finished level of in situ concrete road kerb shall be set accurately on site for approval by the Engineer. • The depression areas along alignment must be regulated by crusher run and compacted by main contractor. • Upon approval of the alignment and finished level, the

Get Price

Method Statement Kerbs and Gully Construction Builders

04/08/2016· Basic Method Statement Kerbs and Gully Construction. Posted By safetyadmin On Thursday, August 4, 2016 07:59 AM. Under Method Statements . Check that the issued construction drawing is the latest revision. Kerbs. 1. Engineer to set out Kerb lines, gully and manhole positions. 2. Kerb pans to be set up and concreted in accordance with the design spec. 3. String lines to be tied to the kerb

Get Price

Kerb Laying Method Statement Template HASpod

This Kerb Laying Method Statement template has been prepared and pre-completed for the installation of kerbstones to form kerbs and edges. The method statement includes a safe work procedure and control measures, which you can edit and add your project details. It includes consideration for working next to and on highways, and public footpaths, and the control measures needed to reduce the

Get Price

Kerbstone Works Method Statement Example to Download

Example Method Statements are written by IOSH and NEBOSH qualified Safety Professionals, delivered instantly to your email address ready for you to download and start editing straight away. The template should be changed to suit the exact works you are carrying out. Method Statements are comprehensive, and are about 4-7 pages long, with space for your company details and logo.

Get Price

KASSEL AND TRIEF KERB GUIDE TO HANDLING AND LAYING

The line of the kerb at the road edge remains unaff ected by the installation of Trief kerb (fig 2). Fig 2 Trief Kerb with two 38mm dia. dowel holes are availabl e (please check for availability). These units are placed on the concrete foundation and dowel bars (560mm x 16mm dia.) driven down into the foundation. The gap around the bars should be filled with grout. When laying to radius

Get Price

Health & Safety Documentation Method Statement

Method Statement Client Gary Fletcher (Surfacing) Ltd Address Generic Documentation Date 15/11/2016 Prepared By C L Brown / J Sanders Key kerbs to be laid upon a bed of mortar or concrete and haunched. 7. Edgings to be laid upon a minimum bed of 100mm of concrete and haunched. 8. Infill the hard margin with a minimum of 150mm of concrete and level prior to laying of block paving. 9.

Get Price

Method Statement for Installation of Kerbstone and

05/06/2018· Method Statement for Installation of Kerbstone and Interlock Tiles Inside the Building. 2. Purpose and Scope. The purpose of this method statement is to specifically describe the tasks that company needs to perform when installing Kerbstone and Interlock and all the additional work to complete the project. Our goal is to ensure the quality and

Get Price

INSTALLATION DETAILS FOR KERB & EDGINGS

Kerb and edging units are laid onto a concrete foundation. The foundation should typically be around 100mm thick, of well compacted semi-dry concrete, typically a 1:2:4 (cement:sand:aggregate) mix will be sufficient, depending upon the expected loadings and ground conditions. A minimum of a third of the unit must be fully bedded into the mortar mix. Laying Instructions Set up string lines to

Get Price

INSTALLATION DETAILS FOR KERB & EDGINGS

Bedding Kerb and edging units are laid onto a concrete foundation. The foundation should typically be around 100mm thick, of well compacted semi-dry concrete, typically a 1:2:4 (cement:sand:aggregate) mix will be sufficient, depending upon the expected loadings and ground conditions.

Get Price

KASSEL AND TRIEF KERB GUIDE TO HANDLING AND LAYING

The line of the kerb at the road edge remains unaff ected by the installation of Trief kerb (fig 2). Fig 2 Trief Kerb with two 38mm dia. dowel holes are availabl e (please check for availability). These units are placed on the concrete foundation and dowel bars (560mm x 16mm dia.) driven down into the foundation. The gap around the bars should be filled with grout. When laying to radius

Get Price

Method of Statement Road furniture works

09/12/2015· Step 5 Carry out joint inspection with the Subcontractor on road furniture completed. Road Kerb Step 1 From the reference line setup, excavate to base level of the kerb. Check the level by spirit level to ensure the depth. Step 2 Place concrete base and lay the kerb onto the concrete. Adjust the kerb to the required level. Fill mortar in the joint. Step 3 Apply prime coat paint to the kerb and

Get Price

Precast Concrete Kerbs Highways Department

RADIUS KERBS 1000 PLAN VIEW Exlernol rod .. s kerbs sholl have a radius (R) of 1,3,6 or 9 melres and shol be of kerb lype Kl section. QUADRANTS 300 radius I. 300 PLAN VIEW END VIEW PRECAST CONCRETE KERBS (SHEET 1 OF 2) .1 REF. Noles' 1. The nominollenglh of a kerb "';1 sholl be 1000 mm and on edgilg unil 750. 2.

Get Price

Site Work Method Statement laying paving slabs, pavers

This Method Statement is for laying paving whether it is in the form of paving slabs, brick pavers or stone setts. It covers the working around machinery and the need to have the area cleared of unnecessary personnel. The Method Statement will include the mechanical plant

Get Price

method of statement for interlocking block and curb stone

17/01/2013· method of statement for interlocking block and curb stone. Summary: This Method of Statement applies to the following; • Materials for Application; 1. Pr-Cast Curb Stone. 2. Interlocking Block, 3. Aggregate Sub-base & Base Coarse. 4. Geo textile, Separation Layer-Geotextile Fabric 140. 5. Mortar. 6. Soil Sterilizer . 1. Delivery, Storage and Handling of curb stone and interlocking block: A

Get Price

Roof Installation Method Statement SafeContractor

Roof Installation Method Statement A Basic Guide to preparation Introduction This Guidance Note gives practical information about creating a method statement. A completed sample template has been included in Appendix 1 and a blank template in Appendix 2. If you wish to use the template in Appendix 2 to construct your own documents, you must ensure that all references to Alcumus SafeContractor

Get Price

Method Statement for Asphalt Paving Works Civil

Method Statement for Asphalt Paving Works are given below: 1. Scope: The scope of work of this method statement is to describe the responsibilities of personnel involved, execution procedure, safety factors and documents to be recorded for Asphalt Paving Works. 2. Relevant Process/Specifications: Tender Specifications 3. Responsibility: ADVERTISEMENTS: The Construction Manager/Project

Get Price

Metod Statement and Risk Assessment-1

METHOD STATEMENT AND RISK ASSESSMENT 7/9 Abbotsbury Road, London W14 8EH 7th May 2013 . 1. INTRODUCTION The following statement is intended to outline the proposed method of construction to be carried out by Metropolitan Basements at the above address. The project consists of the installation of drainage, underpinning, erection of rc walls, construction of first floor deck,

Get Price

(PDF) Method Statement ASPHALTIC CONCRETE WORKS

9.1.9 Asphalt lay down will proc eeds from start to end direction along the Road. according to the approved method statement and all in-situ tests are. implemented. 10.3 Quality Control

Get Price